CVE-2025-1273 (GCVE-0-2025-1273)
Vulnerability from cvelistv5 – Published: 2025-04-15 20:56 – Updated: 2025-09-25 18:45
VLAI?
Summary
A maliciously crafted PDF file, when linked or imported into Autodesk applications, can force a Heap-Based Overflow vulnerability. A malicious actor can leverage this vulnerability to cause a crash, read sensitive data, or execute arbitrary code in the context of the current process.
Severity ?
7.8 (High)
CWE
- CWE-122 - Heap-Based Buffer Overflow
Assigner
References
| URL | Tags | |
|---|---|---|
Impacted products
| Vendor | Product | Version | ||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Autodesk | Revit |
Affected:
2025 , < 2025.4.1
(custom)
Affected: 2024 , < 2024.3.2 (custom) Affected: 2023 , < 2023.1.7 (custom) cpe:2.3:a:autodesk:revit:2025:*:*:*:*:*:*:* cpe:2.3:a:autodesk:revit:2024:*:*:*:*:*:*:* cpe:2.3:a:autodesk:revit:2023:*:*:*:*:*:*:* |
||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||
{
"containers": {
"adp": [
{
"metrics": [
{
"other": {
"content": {
"id": "CVE-2025-1273",
"options": [
{
"Exploitation": "none"
},
{
"Automatable": "no"
},
{
"Technical Impact": "total"
}
],
"role": "CISA Coordinator",
"timestamp": "2025-04-17T00:00:00+00:00",
"version": "2.0.3"
},
"type": "ssvc"
}
}
],
"providerMetadata": {
"dateUpdated": "2025-04-18T03:55:33.632Z",
"orgId": "134c704f-9b21-4f2e-91b3-4a467353bcc0",
"shortName": "CISA-ADP"
},
"title": "CISA ADP Vulnrichment"
}
],
"cna": {
"affected": [
{
"cpes": [
"cpe:2.3:a:autodesk:revit:2025:*:*:*:*:*:*:*",
"cpe:2.3:a:autodesk:revit:2024:*:*:*:*:*:*:*",
"cpe:2.3:a:autodesk:revit:2023:*:*:*:*:*:*:*"
],
"defaultStatus": "unaffected",
"product": "Revit",
"vendor": "Autodesk",
"versions": [
{
"lessThan": "2025.4.1",
"status": "affected",
"version": "2025",
"versionType": "custom"
},
{
"lessThan": "2024.3.2",
"status": "affected",
"version": "2024",
"versionType": "custom"
},
{
"lessThan": "2023.1.7",
"status": "affected",
"version": "2023",
"versionType": "custom"
}
]
},
{
"cpes": [
"cpe:2.3:a:autodesk:autocad:2025:*:*:*:*:*:*:*",
"cpe:2.3:a:autodesk:autocad:2024:*:*:*:*:*:*:*",
"cpe:2.3:a:autodesk:autocad:2023:*:*:*:*:*:*:*"
],
"defaultStatus": "unaffected",
"product": "AutoCAD",
"vendor": "Autodesk",
"versions": [
{
"lessThan": "2025.1.3",
"status": "affected",
"version": "2025",
"versionType": "custom"
},
{
"lessThan": "2024.1.8",
"status": "affected",
"version": "2024",
"versionType": "custom"
},
{
"lessThan": "2023.1.8",
"status": "affected",
"version": "2023",
"versionType": "custom"
}
]
},
{
"cpes": [
"cpe:2.3:a:autodesk:autocad_lt:2025:*:*:*:*:*:*:*",
"cpe:2.3:a:autodesk:autocad_lt:2024:*:*:*:*:*:*:*",
"cpe:2.3:a:autodesk:autocad_lt:2023:*:*:*:*:*:*:*"
],
"defaultStatus": "unaffected",
"product": "AutoCAD LT",
"vendor": "Autodesk",
"versions": [
{
"lessThan": "2025.1.3",
"status": "affected",
"version": "2025",
"versionType": "custom"
},
{
"lessThan": "2024.1.8",
"status": "affected",
"version": "2024",
"versionType": "custom"
},
{
"lessThan": "2023.1.8",
"status": "affected",
"version": "2023",
"versionType": "custom"
}
]
},
{
"cpes": [
"cpe:2.3:a:autodesk:autocad_architecture:2025:*:*:*:*:*:*:*",
"cpe:2.3:a:autodesk:autocad_architecture:2024:*:*:*:*:*:*:*",
"cpe:2.3:a:autodesk:autocad_architecture:2023:*:*:*:*:*:*:*"
],
"defaultStatus": "unaffected",
"product": "AutoCAD Architecture",
"vendor": "Autodesk",
"versions": [
{
"lessThan": "2025.1.3",
"status": "affected",
"version": "2025",
"versionType": "custom"
},
{
"lessThan": "2024.1.8",
"status": "affected",
"version": "2024",
"versionType": "custom"
},
{
"lessThan": "2023.1.8",
"status": "affected",
"version": "2023",
"versionType": "custom"
}
]
},
{
"cpes": [
"cpe:2.3:a:autodesk:autocad_electrical:2025:*:*:*:*:*:*:*",
"cpe:2.3:a:autodesk:autocad_electrical:2024:*:*:*:*:*:*:*",
"cpe:2.3:a:autodesk:autocad_electrical:2023:*:*:*:*:*:*:*"
],
"defaultStatus": "unaffected",
"product": "AutoCAD Electrical",
"vendor": "Autodesk",
"versions": [
{
"lessThan": "2025.1.3",
"status": "affected",
"version": "2025",
"versionType": "custom"
},
{
"lessThan": "2024.1.8",
"status": "affected",
"version": "2024",
"versionType": "custom"
},
{
"lessThan": "2023.1.8",
"status": "affected",
"version": "2023",
"versionType": "custom"
}
]
},
{
"cpes": [
"cpe:2.3:a:autodesk:autocad_map_3d:2025:*:*:*:*:*:*:*",
"cpe:2.3:a:autodesk:autocad_map_3d:2024:*:*:*:*:*:*:*",
"cpe:2.3:a:autodesk:autocad_map_3d:2023:*:*:*:*:*:*:*"
],
"defaultStatus": "unaffected",
"product": "AutoCAD MAP 3D",
"vendor": "Autodesk",
"versions": [
{
"lessThan": "2025.1.3",
"status": "affected",
"version": "2025",
"versionType": "custom"
},
{
"lessThan": "2024.1.8",
"status": "affected",
"version": "2024",
"versionType": "custom"
},
{
"lessThan": "2023.1.8",
"status": "affected",
"version": "2023",
"versionType": "custom"
}
]
},
{
"cpes": [
"cpe:2.3:a:autodesk:autocad_mechanical:2025:*:*:*:*:*:*:*",
"cpe:2.3:a:autodesk:autocad_mechanical:2024:*:*:*:*:*:*:*",
"cpe:2.3:a:autodesk:autocad_mechanical:2023:*:*:*:*:*:*:*"
],
"defaultStatus": "unaffected",
"product": "AutoCAD Mechanical",
"vendor": "Autodesk",
"versions": [
{
"lessThan": "2025.1.3",
"status": "affected",
"version": "2025",
"versionType": "custom"
},
{
"lessThan": "2024.1.8",
"status": "affected",
"version": "2024",
"versionType": "custom"
},
{
"lessThan": "2023.1.8",
"status": "affected",
"version": "2023",
"versionType": "custom"
}
]
},
{
"cpes": [
"cpe:2.3:a:autodesk:autocad_mep:2025:*:*:*:*:*:*:*",
"cpe:2.3:a:autodesk:autocad_mep:2024:*:*:*:*:*:*:*",
"cpe:2.3:a:autodesk:autocad_mep:2023:*:*:*:*:*:*:*"
],
"defaultStatus": "unaffected",
"product": "AutoCAD MEP",
"vendor": "Autodesk",
"versions": [
{
"lessThan": "2025.1.3",
"status": "affected",
"version": "2025",
"versionType": "custom"
},
{
"lessThan": "2024.1.8",
"status": "affected",
"version": "2024",
"versionType": "custom"
},
{
"lessThan": "2023.1.8",
"status": "affected",
"version": "2023",
"versionType": "custom"
}
]
},
{
"cpes": [
"cpe:2.3:a:autodesk:autocad_plant_3d:2025:*:*:*:*:*:*:*",
"cpe:2.3:a:autodesk:autocad_plant_3d:2024:*:*:*:*:*:*:*",
"cpe:2.3:a:autodesk:autocad_plant_3d:2023:*:*:*:*:*:*:*"
],
"defaultStatus": "unaffected",
"product": "AutoCAD Plant 3D",
"vendor": "Autodesk",
"versions": [
{
"lessThan": "2025.1.3",
"status": "affected",
"version": "2025",
"versionType": "custom"
},
{
"lessThan": "2024.1.8",
"status": "affected",
"version": "2024",
"versionType": "custom"
},
{
"lessThan": "2023.1.8",
"status": "affected",
"version": "2023",
"versionType": "custom"
}
]
},
{
"cpes": [
"cpe:2.3:a:autodesk:civil_3d:2025:*:*:*:*:*:*:*",
"cpe:2.3:a:autodesk:civil_3d:2024:*:*:*:*:*:*:*",
"cpe:2.3:a:autodesk:civil_3d:2023:*:*:*:*:*:*:*"
],
"defaultStatus": "unaffected",
"product": "Civil 3D",
"vendor": "Autodesk",
"versions": [
{
"lessThan": "2025.1.3",
"status": "affected",
"version": "2025",
"versionType": "custom"
},
{
"lessThan": "2024.1.8",
"status": "affected",
"version": "2024",
"versionType": "custom"
},
{
"lessThan": "2023.1.8",
"status": "affected",
"version": "2023",
"versionType": "custom"
}
]
},
{
"cpes": [
"cpe:2.3:a:autodesk:advance_steel:2025:*:*:*:*:*:*:*",
"cpe:2.3:a:autodesk:advance_steel:2024:*:*:*:*:*:*:*",
"cpe:2.3:a:autodesk:advance_steel:2023:*:*:*:*:*:*:*"
],
"defaultStatus": "unaffected",
"product": "Advance Steel",
"vendor": "Autodesk",
"versions": [
{
"lessThan": "2025.1.3",
"status": "affected",
"version": "2025",
"versionType": "custom"
},
{
"lessThan": "2024.1.8",
"status": "affected",
"version": "2024",
"versionType": "custom"
},
{
"lessThan": "2023.1.8",
"status": "affected",
"version": "2023",
"versionType": "custom"
}
]
}
],
"descriptions": [
{
"lang": "en",
"supportingMedia": [
{
"base64": false,
"type": "text/html",
"value": "A maliciously crafted PDF file, when linked or imported into Autodesk applications, can force a Heap-Based Overflow vulnerability. A malicious actor can leverage this vulnerability to cause a crash, read sensitive data, or execute arbitrary code in the context of the current process.\u003cbr\u003e"
}
],
"value": "A maliciously crafted PDF file, when linked or imported into Autodesk applications, can force a Heap-Based Overflow vulnerability. A malicious actor can leverage this vulnerability to cause a crash, read sensitive data, or execute arbitrary code in the context of the current process."
}
],
"impacts": [
{
"capecId": "CAPEC-100",
"descriptions": [
{
"lang": "en",
"value": "CAPEC-100 Overflow Buffers"
}
]
}
],
"metrics": [
{
"cvssV3_1": {
"attackComplexity": "LOW",
"attackVector": "LOCAL",
"availabilityImpact": "HIGH",
"baseScore": 7.8,
"baseSeverity": "HIGH",
"confidentialityImpact": "HIGH",
"integrityImpact": "HIGH",
"privilegesRequired": "NONE",
"scope": "UNCHANGED",
"userInteraction": "REQUIRED",
"vectorString": "CVSS:3.1/AV:L/AC:L/PR:N/UI:R/S:U/C:H/I:H/A:H",
"version": "3.1"
},
"format": "CVSS",
"scenarios": [
{
"lang": "en",
"value": "GENERAL"
}
]
}
],
"problemTypes": [
{
"descriptions": [
{
"cweId": "CWE-122",
"description": "CWE-122 Heap-Based Buffer Overflow",
"lang": "en",
"type": "CWE"
}
]
}
],
"providerMetadata": {
"dateUpdated": "2025-09-25T18:45:07.442Z",
"orgId": "7e40ea87-bc65-4944-9723-dd79dd760601",
"shortName": "autodesk"
},
"references": [
{
"tags": [
"patch"
],
"url": "https://www.autodesk.com/products/autodesk-access/overview"
},
{
"tags": [
"vendor-advisory"
],
"url": "https://www.autodesk.com/trust/security-advisories/adsk-sa-2025-0003"
}
],
"source": {
"discovery": "EXTERNAL"
},
"title": "PDF File Parsing Heap-Based Overflow Vulnerability",
"x_generator": {
"engine": "Vulnogram 0.2.0"
}
}
},
"cveMetadata": {
"assignerOrgId": "7e40ea87-bc65-4944-9723-dd79dd760601",
"assignerShortName": "autodesk",
"cveId": "CVE-2025-1273",
"datePublished": "2025-04-15T20:56:04.970Z",
"dateReserved": "2025-02-13T15:16:28.058Z",
"dateUpdated": "2025-09-25T18:45:07.442Z",
"state": "PUBLISHED"
},
"dataType": "CVE_RECORD",
"dataVersion": "5.1",
"vulnerability-lookup:meta": {
"nvd": "{\"cve\":{\"id\":\"CVE-2025-1273\",\"sourceIdentifier\":\"psirt@autodesk.com\",\"published\":\"2025-04-15T21:15:46.960\",\"lastModified\":\"2025-08-19T13:15:38.577\",\"vulnStatus\":\"Modified\",\"cveTags\":[],\"descriptions\":[{\"lang\":\"en\",\"value\":\"A maliciously crafted PDF file, when linked or imported into Autodesk applications, can force a Heap-Based Overflow vulnerability. A malicious actor can leverage this vulnerability to cause a crash, read sensitive data, or execute arbitrary code in the context of the current process.\"},{\"lang\":\"es\",\"value\":\"Un archivo PDF manipulado con fines maliciosos, al vincularse o importarse a aplicaciones de Autodesk, puede generar una vulnerabilidad de desbordamiento basado en mont\u00f3n. Un agente malicioso puede aprovechar esta vulnerabilidad para provocar un bloqueo, leer datos confidenciales o ejecutar c\u00f3digo arbitrario en el contexto del proceso actual.\"}],\"metrics\":{\"cvssMetricV31\":[{\"source\":\"psirt@autodesk.com\",\"type\":\"Secondary\",\"cvssData\":{\"version\":\"3.1\",\"vectorString\":\"CVSS:3.1/AV:L/AC:L/PR:N/UI:R/S:U/C:H/I:H/A:H\",\"baseScore\":7.8,\"baseSeverity\":\"HIGH\",\"attackVector\":\"LOCAL\",\"attackComplexity\":\"LOW\",\"privilegesRequired\":\"NONE\",\"userInteraction\":\"REQUIRED\",\"scope\":\"UNCHANGED\",\"confidentialityImpact\":\"HIGH\",\"integrityImpact\":\"HIGH\",\"availabilityImpact\":\"HIGH\"},\"exploitabilityScore\":1.8,\"impactScore\":5.9},{\"source\":\"nvd@nist.gov\",\"type\":\"Primary\",\"cvssData\":{\"version\":\"3.1\",\"vectorString\":\"CVSS:3.1/AV:L/AC:L/PR:N/UI:R/S:U/C:H/I:H/A:H\",\"baseScore\":7.8,\"baseSeverity\":\"HIGH\",\"attackVector\":\"LOCAL\",\"attackComplexity\":\"LOW\",\"privilegesRequired\":\"NONE\",\"userInteraction\":\"REQUIRED\",\"scope\":\"UNCHANGED\",\"confidentialityImpact\":\"HIGH\",\"integrityImpact\":\"HIGH\",\"availabilityImpact\":\"HIGH\"},\"exploitabilityScore\":1.8,\"impactScore\":5.9}]},\"weaknesses\":[{\"source\":\"psirt@autodesk.com\",\"type\":\"Secondary\",\"description\":[{\"lang\":\"en\",\"value\":\"CWE-122\"}]},{\"source\":\"nvd@nist.gov\",\"type\":\"Primary\",\"description\":[{\"lang\":\"en\",\"value\":\"CWE-787\"}]}],\"configurations\":[{\"nodes\":[{\"operator\":\"OR\",\"negate\":false,\"cpeMatch\":[{\"vulnerable\":true,\"criteria\":\"cpe:2.3:a:autodesk:revit:*:*:*:*:*:*:*:*\",\"versionStartIncluding\":\"2023\",\"versionEndExcluding\":\"2023.1.7\",\"matchCriteriaId\":\"3EA52EB6-C7F7-4CAF-9932-6E434F6AF08F\"},{\"vulnerable\":true,\"criteria\":\"cpe:2.3:a:autodesk:revit:*:*:*:*:*:*:*:*\",\"versionStartIncluding\":\"2024\",\"versionEndExcluding\":\"2024.3.2\",\"matchCriteriaId\":\"5F61D5DA-0CBA-4A14-8CD4-154FFE14E70C\"},{\"vulnerable\":true,\"criteria\":\"cpe:2.3:a:autodesk:revit:*:*:*:*:*:*:*:*\",\"versionStartIncluding\":\"2025\",\"versionEndExcluding\":\"2025.4.1\",\"matchCriteriaId\":\"4229BAB4-AE43-43E3-89ED-1E19445482E1\"}]}]}],\"references\":[{\"url\":\"https://www.autodesk.com/products/autodesk-access/overview\",\"source\":\"psirt@autodesk.com\"},{\"url\":\"https://www.autodesk.com/trust/security-advisories/adsk-sa-2025-0003\",\"source\":\"psirt@autodesk.com\",\"tags\":[\"Vendor Advisory\"]}]}}",
"vulnrichment": {
"containers": "{\"adp\": [{\"title\": \"CISA ADP Vulnrichment\", \"metrics\": [{\"other\": {\"type\": \"ssvc\", \"content\": {\"id\": \"CVE-2025-1273\", \"role\": \"CISA Coordinator\", \"options\": [{\"Exploitation\": \"none\"}, {\"Automatable\": \"no\"}, {\"Technical Impact\": \"total\"}], \"version\": \"2.0.3\", \"timestamp\": \"2025-04-16T14:58:37.247959Z\"}}}], \"providerMetadata\": {\"orgId\": \"134c704f-9b21-4f2e-91b3-4a467353bcc0\", \"shortName\": \"CISA-ADP\", \"dateUpdated\": \"2025-04-16T14:58:39.020Z\"}}], \"cna\": {\"title\": \"PDF File Parsing Heap-Based Overflow Vulnerability\", \"source\": {\"discovery\": \"EXTERNAL\"}, \"impacts\": [{\"capecId\": \"CAPEC-100\", \"descriptions\": [{\"lang\": \"en\", \"value\": \"CAPEC-100 Overflow Buffers\"}]}], \"metrics\": [{\"format\": \"CVSS\", \"cvssV3_1\": {\"scope\": \"UNCHANGED\", \"version\": \"3.1\", \"baseScore\": 7.8, \"attackVector\": \"LOCAL\", \"baseSeverity\": \"HIGH\", \"vectorString\": \"CVSS:3.1/AV:L/AC:L/PR:N/UI:R/S:U/C:H/I:H/A:H\", \"integrityImpact\": \"HIGH\", \"userInteraction\": \"REQUIRED\", \"attackComplexity\": \"LOW\", \"availabilityImpact\": \"HIGH\", \"privilegesRequired\": \"NONE\", \"confidentialityImpact\": \"HIGH\"}, \"scenarios\": [{\"lang\": \"en\", \"value\": \"GENERAL\"}]}], \"affected\": [{\"cpes\": [\"cpe:2.3:a:autodesk:revit:2025:*:*:*:*:*:*:*\", \"cpe:2.3:a:autodesk:revit:2024:*:*:*:*:*:*:*\", \"cpe:2.3:a:autodesk:revit:2023:*:*:*:*:*:*:*\"], \"vendor\": \"Autodesk\", \"product\": \"Revit\", \"versions\": [{\"status\": \"affected\", \"version\": \"2025\", \"lessThan\": \"2025.4.1\", \"versionType\": \"custom\"}, {\"status\": \"affected\", \"version\": \"2024\", \"lessThan\": \"2024.3.2\", \"versionType\": \"custom\"}, {\"status\": \"affected\", \"version\": \"2023\", \"lessThan\": \"2023.1.7\", \"versionType\": \"custom\"}], \"defaultStatus\": \"unaffected\"}, {\"cpes\": [\"cpe:2.3:a:autodesk:autocad:2025:*:*:*:*:*:*:*\", \"cpe:2.3:a:autodesk:autocad:2024:*:*:*:*:*:*:*\", \"cpe:2.3:a:autodesk:autocad:2023:*:*:*:*:*:*:*\"], \"vendor\": \"Autodesk\", \"product\": \"AutoCAD\", \"versions\": [{\"status\": \"affected\", \"version\": \"2025\", \"lessThan\": \"2025.1.3\", \"versionType\": \"custom\"}, {\"status\": \"affected\", \"version\": \"2024\", \"lessThan\": \"2024.1.8\", \"versionType\": \"custom\"}, {\"status\": \"affected\", \"version\": \"2023\", \"lessThan\": \"2023.1.8\", \"versionType\": \"custom\"}], \"defaultStatus\": \"unaffected\"}, {\"cpes\": [\"cpe:2.3:a:autodesk:autocad_lt:2025:*:*:*:*:*:*:*\", \"cpe:2.3:a:autodesk:autocad_lt:2024:*:*:*:*:*:*:*\", \"cpe:2.3:a:autodesk:autocad_lt:2023:*:*:*:*:*:*:*\"], \"vendor\": \"Autodesk\", \"product\": \"AutoCAD LT\", \"versions\": [{\"status\": \"affected\", \"version\": \"2025\", \"lessThan\": \"2025.1.3\", \"versionType\": \"custom\"}, {\"status\": \"affected\", \"version\": \"2024\", \"lessThan\": \"2024.1.8\", \"versionType\": \"custom\"}, {\"status\": \"affected\", \"version\": \"2023\", \"lessThan\": \"2023.1.8\", \"versionType\": \"custom\"}], \"defaultStatus\": \"unaffected\"}, {\"cpes\": [\"cpe:2.3:a:autodesk:autocad_architecture:2025:*:*:*:*:*:*:*\", \"cpe:2.3:a:autodesk:autocad_architecture:2024:*:*:*:*:*:*:*\", \"cpe:2.3:a:autodesk:autocad_architecture:2023:*:*:*:*:*:*:*\"], \"vendor\": \"Autodesk\", \"product\": \"AutoCAD Architecture\", \"versions\": [{\"status\": \"affected\", \"version\": \"2025\", \"lessThan\": \"2025.1.3\", \"versionType\": \"custom\"}, {\"status\": \"affected\", \"version\": \"2024\", \"lessThan\": \"2024.1.8\", \"versionType\": \"custom\"}, {\"status\": \"affected\", \"version\": \"2023\", \"lessThan\": \"2023.1.8\", \"versionType\": \"custom\"}], \"defaultStatus\": \"unaffected\"}, {\"cpes\": [\"cpe:2.3:a:autodesk:autocad_electrical:2025:*:*:*:*:*:*:*\", \"cpe:2.3:a:autodesk:autocad_electrical:2024:*:*:*:*:*:*:*\", \"cpe:2.3:a:autodesk:autocad_electrical:2023:*:*:*:*:*:*:*\"], \"vendor\": \"Autodesk\", \"product\": \"AutoCAD Electrical\", \"versions\": [{\"status\": \"affected\", \"version\": \"2025\", \"lessThan\": \"2025.1.3\", \"versionType\": \"custom\"}, {\"status\": \"affected\", \"version\": \"2024\", \"lessThan\": \"2024.1.8\", \"versionType\": \"custom\"}, {\"status\": \"affected\", \"version\": \"2023\", \"lessThan\": \"2023.1.8\", \"versionType\": \"custom\"}], \"defaultStatus\": \"unaffected\"}, {\"cpes\": [\"cpe:2.3:a:autodesk:autocad_map_3d:2025:*:*:*:*:*:*:*\", \"cpe:2.3:a:autodesk:autocad_map_3d:2024:*:*:*:*:*:*:*\", \"cpe:2.3:a:autodesk:autocad_map_3d:2023:*:*:*:*:*:*:*\"], \"vendor\": \"Autodesk\", \"product\": \"AutoCAD MAP 3D\", \"versions\": [{\"status\": \"affected\", \"version\": \"2025\", \"lessThan\": \"2025.1.3\", \"versionType\": \"custom\"}, {\"status\": \"affected\", \"version\": \"2024\", \"lessThan\": \"2024.1.8\", \"versionType\": \"custom\"}, {\"status\": \"affected\", \"version\": \"2023\", \"lessThan\": \"2023.1.8\", \"versionType\": \"custom\"}], \"defaultStatus\": \"unaffected\"}, {\"cpes\": [\"cpe:2.3:a:autodesk:autocad_mechanical:2025:*:*:*:*:*:*:*\", \"cpe:2.3:a:autodesk:autocad_mechanical:2024:*:*:*:*:*:*:*\", \"cpe:2.3:a:autodesk:autocad_mechanical:2023:*:*:*:*:*:*:*\"], \"vendor\": \"Autodesk\", \"product\": \"AutoCAD Mechanical\", \"versions\": [{\"status\": \"affected\", \"version\": \"2025\", \"lessThan\": \"2025.1.3\", \"versionType\": \"custom\"}, {\"status\": \"affected\", \"version\": \"2024\", \"lessThan\": \"2024.1.8\", \"versionType\": \"custom\"}, {\"status\": \"affected\", \"version\": \"2023\", \"lessThan\": \"2023.1.8\", \"versionType\": \"custom\"}], \"defaultStatus\": \"unaffected\"}, {\"cpes\": [\"cpe:2.3:a:autodesk:autocad_mep:2025:*:*:*:*:*:*:*\", \"cpe:2.3:a:autodesk:autocad_mep:2024:*:*:*:*:*:*:*\", \"cpe:2.3:a:autodesk:autocad_mep:2023:*:*:*:*:*:*:*\"], \"vendor\": \"Autodesk\", \"product\": \"AutoCAD MEP\", \"versions\": [{\"status\": \"affected\", \"version\": \"2025\", \"lessThan\": \"2025.1.3\", \"versionType\": \"custom\"}, {\"status\": \"affected\", \"version\": \"2024\", \"lessThan\": \"2024.1.8\", \"versionType\": \"custom\"}, {\"status\": \"affected\", \"version\": \"2023\", \"lessThan\": \"2023.1.8\", \"versionType\": \"custom\"}], \"defaultStatus\": \"unaffected\"}, {\"cpes\": [\"cpe:2.3:a:autodesk:autocad_plant_3d:2025:*:*:*:*:*:*:*\", \"cpe:2.3:a:autodesk:autocad_plant_3d:2024:*:*:*:*:*:*:*\", \"cpe:2.3:a:autodesk:autocad_plant_3d:2023:*:*:*:*:*:*:*\"], \"vendor\": \"Autodesk\", \"product\": \"AutoCAD Plant 3D\", \"versions\": [{\"status\": \"affected\", \"version\": \"2025\", \"lessThan\": \"2025.1.3\", \"versionType\": \"custom\"}, {\"status\": \"affected\", \"version\": \"2024\", \"lessThan\": \"2024.1.8\", \"versionType\": \"custom\"}, {\"status\": \"affected\", \"version\": \"2023\", \"lessThan\": \"2023.1.8\", \"versionType\": \"custom\"}], \"defaultStatus\": \"unaffected\"}, {\"cpes\": [\"cpe:2.3:a:autodesk:civil_3d:2025:*:*:*:*:*:*:*\", \"cpe:2.3:a:autodesk:civil_3d:2024:*:*:*:*:*:*:*\", \"cpe:2.3:a:autodesk:civil_3d:2023:*:*:*:*:*:*:*\"], \"vendor\": \"Autodesk\", \"product\": \"Civil 3D\", \"versions\": [{\"status\": \"affected\", \"version\": \"2025\", \"lessThan\": \"2025.1.3\", \"versionType\": \"custom\"}, {\"status\": \"affected\", \"version\": \"2024\", \"lessThan\": \"2024.1.8\", \"versionType\": \"custom\"}, {\"status\": \"affected\", \"version\": \"2023\", \"lessThan\": \"2023.1.8\", \"versionType\": \"custom\"}], \"defaultStatus\": \"unaffected\"}, {\"cpes\": [\"cpe:2.3:a:autodesk:advance_steel:2025:*:*:*:*:*:*:*\", \"cpe:2.3:a:autodesk:advance_steel:2024:*:*:*:*:*:*:*\", \"cpe:2.3:a:autodesk:advance_steel:2023:*:*:*:*:*:*:*\"], \"vendor\": \"Autodesk\", \"product\": \"Advance Steel\", \"versions\": [{\"status\": \"affected\", \"version\": \"2025\", \"lessThan\": \"2025.1.3\", \"versionType\": \"custom\"}, {\"status\": \"affected\", \"version\": \"2024\", \"lessThan\": \"2024.1.8\", \"versionType\": \"custom\"}, {\"status\": \"affected\", \"version\": \"2023\", \"lessThan\": \"2023.1.8\", \"versionType\": \"custom\"}], \"defaultStatus\": \"unaffected\"}], \"references\": [{\"url\": \"https://www.autodesk.com/products/autodesk-access/overview\", \"tags\": [\"patch\"]}, {\"url\": \"https://www.autodesk.com/trust/security-advisories/adsk-sa-2025-0003\", \"tags\": [\"vendor-advisory\"]}], \"x_generator\": {\"engine\": \"Vulnogram 0.2.0\"}, \"descriptions\": [{\"lang\": \"en\", \"value\": \"A maliciously crafted PDF file, when linked or imported into Autodesk applications, can force a Heap-Based Overflow vulnerability. A malicious actor can leverage this vulnerability to cause a crash, read sensitive data, or execute arbitrary code in the context of the current process.\", \"supportingMedia\": [{\"type\": \"text/html\", \"value\": \"A maliciously crafted PDF file, when linked or imported into Autodesk applications, can force a Heap-Based Overflow vulnerability. A malicious actor can leverage this vulnerability to cause a crash, read sensitive data, or execute arbitrary code in the context of the current process.\u003cbr\u003e\", \"base64\": false}]}], \"problemTypes\": [{\"descriptions\": [{\"lang\": \"en\", \"type\": \"CWE\", \"cweId\": \"CWE-122\", \"description\": \"CWE-122 Heap-Based Buffer Overflow\"}]}], \"providerMetadata\": {\"orgId\": \"7e40ea87-bc65-4944-9723-dd79dd760601\", \"shortName\": \"autodesk\", \"dateUpdated\": \"2025-09-25T18:45:07.442Z\"}}}",
"cveMetadata": "{\"cveId\": \"CVE-2025-1273\", \"state\": \"PUBLISHED\", \"dateUpdated\": \"2025-09-25T18:45:07.442Z\", \"dateReserved\": \"2025-02-13T15:16:28.058Z\", \"assignerOrgId\": \"7e40ea87-bc65-4944-9723-dd79dd760601\", \"datePublished\": \"2025-04-15T20:56:04.970Z\", \"assignerShortName\": \"autodesk\"}",
"dataType": "CVE_RECORD",
"dataVersion": "5.1"
}
}
}
Loading…
Loading…
Sightings
| Author | Source | Type | Date |
|---|
Nomenclature
- Seen: The vulnerability was mentioned, discussed, or observed by the user.
- Confirmed: The vulnerability has been validated from an analyst's perspective.
- Published Proof of Concept: A public proof of concept is available for this vulnerability.
- Exploited: The vulnerability was observed as exploited by the user who reported the sighting.
- Patched: The vulnerability was observed as successfully patched by the user who reported the sighting.
- Not exploited: The vulnerability was not observed as exploited by the user who reported the sighting.
- Not confirmed: The user expressed doubt about the validity of the vulnerability.
- Not patched: The vulnerability was not observed as successfully patched by the user who reported the sighting.
Loading…
Loading…